The date on the contract is the date on the keys. One schedule, one team, a photograph every Friday.

4.2M sq ft delivered
Handed over on the date written eleven months earlier. I still have the email.
Meera Krishnan/ Developer, The Nilaya, Bengaluru

Ten-year structural warranty

In writing

Backed by the group's own engineers, who checked the drawings before the first pour and will answer for the slab.

A photograph every Friday

You see the site

Fifty-two dated site photographs a year, sent before you ask. Forward them to your investors as they are.

One contract

Nothing falls between

Design, structure and build under one name. There is no consultant gap for the schedule to slip into.

Selected work

Built, and handed over on the date in the contract

Delivered

The Nilaya

Koramangala, Bengaluru · G+14 tower · 120 homes

Handed over eleven days early. Nobody had believed the date either.

Under construction

Riverdale Terraces

Wakad, Pune · 3 towers · 380 homes

Riverside piling, eleven hundred people on site, not one lost-time incident.

Under construction

Onyx One

OMR, Chennai · Tower · 160 homes

Structure topped out four weeks ahead of the baseline.

Delivered

Highfield Residences

Whitefield, Bengaluru · 2 towers · 210 homes

Structure to handover in twenty-two months. A snag list under forty items.

Under construction

Acred Meadows

Devanahalli, Bengaluru · 96 villas

Precast walls, one villa a week, and a site you could eat off.

Under construction

The Acred Square

Kokapet, Hyderabad · Mixed-use · 320 homes

Two basement levels dug under a live retail podium. Planned, not improvised.

Your projectBring us the brief.
What we do

Everything between the drawing and the keys

Turnkey or structure only, towers or villas. One contract, one team that answers for it, and a schedule you can check against the photographs.

  • Turnkey residential

    Towers and apartments from the first excavation to handover, under one contract.

    • Single contract
    • Fixed handover date
    • Snag-free handover
  • Villa communities

    Precast and conventional villas built quickly without losing the finish.

    • Precast systems
    • Landscape and roads
    • Phase-wise handover
  • Structure and services

    Shell-and-core or structure-only packages with our own engineers standing on the slab.

    • RCC and precast
    • Services installation
    • Waterproofing warranty
  • Fit-outs

    Lobbies, clubhouses, offices and show flats finished as drawn.

    • Clubhouses
    • Show flats
    • Commercial fit-outs
  • Quality and safety

    ISO 9001 and 45001 systems, third-party audits, and a site you can walk on any day without notice.

    • ISO certified
    • Third-party audits
    • Zero-harm programme
  • Project controls

    Cost, schedule and photographs every week, sent before you think to ask.

    • Weekly photo report
    • Cost tracking
    • Milestone billing
How it runs

From the first excavator to the keys

Four phases. Each one ends with a milestone you can see for yourself in the Friday photograph.

  1. Month 0

    The price that holds

    Quantities, method statements and a fixed price, agreed before an excavator is booked.

  2. Months 1 to 3

    Into the ground

    Site set-up, piling or rafts, and your first Friday photograph.

  3. The frame

    A floor every seven days

    Floor cycles held to the day, with services installed alongside the structure rather than chased in later.

  4. The last mile

    Snag, sign, hand over

    Snagging with your team, the document set, and the keys on the date written in the contract.

A building is a promise with a date on it.

Who leads
  • Er. Vikram NairManaging director
  • Er. Priya MenonHead of projects
  • Suresh KumarHead of quality and safety
What clients said at handover
Eleven days early. I have never written that sentence about a contractor before.
Rajesh IyerManaging director, Bengaluru
The Friday photograph became the thing our investors waited for. Nobody had to chase anyone.
Meera KulkarniProject head, Pune
The price on the bill of quantities was the price on the final bill. That is the whole review.
Anand KrishnanPromoter, Chennai
01 / 03

Watchit rise


Speak with us
Next

Real Estate

Sell-side mandates for developers: the price, the marketing, the sales floor and every channel partner, under one team.

(Scroll)